top of page

Equipment and Resource Allocation

​

Purpose

​

The purpose of this Standard Operating Procedure (SOP) is to outline the process for identifying, allocating, and managing equipment and resources for projects at F7 Studios. This SOP ensures that equipment is available, properly maintained, and allocated efficiently, supporting a smooth production process.

​

1. Equipment and Resource Planning

​

  1. Define Equipment and Resource Requirements

    • The Producer and Director will review the project’s script, storyboard, and shot list to identify specific equipment needs (e.g., cameras, lighting, sound, rigging).

    • Each department head (e.g., Cinematography, Sound, Lighting) will provide a list of required equipment, specialized tools, and other resources specific to their department’s needs.

  2. Create Equipment and Resource List

    • The Producer will compile all departmental requirements into a comprehensive Equipment and Resource List that includes quantities, technical specifications, and any specialized equipment or materials.

    • The list will be cross-checked against the F7 Studios equipment inventory to determine availability and identify any gaps.

  3. Budget Allocation for Equipment and Rentals

    • The Financial Analyst will create a budget allocation for equipment and rentals, factoring in potential additional costs for specialized equipment or rentals.

    • The budget must be reviewed and approved by the CFO and shared with the Producer to guide resource planning.

 

2. Equipment Reservation and Allocation

​

  1. Internal Equipment Reservation

    • The Producer will coordinate with the Equipment Manager to reserve any necessary in-house equipment, ensuring availability for the project’s timeline.

    • Equipment reservations will be logged in the Equipment Management System (EMS), including details such as project name, reservation dates, and allocated department.

  2. External Equipment Rental Process

    • For equipment not available in-house, the Producer will source rentals from approved vendors, based on quality, availability, and pricing.

    • The Equipment Manager will handle rental arrangements, including scheduling delivery and pickup, negotiating rental terms, and securing insurance coverage for rented equipment.

    • All rental agreements must be reviewed by the Legal Department and approved by the CFO before finalizing.

  3. Equipment Allocation Documentation

    • Each piece of equipment will be tagged and assigned to the designated department or crew member responsible for its use.

    • The Producer will document all allocations in the EMS, noting the equipment’s assigned user, purpose, and location on set.

 

3. Equipment Check-Out and Check-In Process

​

  1. Pre-Production Equipment Check-Out

    • Prior to production, each department head will coordinate with the Equipment Manager to check out all assigned equipment, ensuring items are in good working order.

    • Equipment will be inspected, cleaned, and prepared for use. The Equipment Manager will provide usage instructions and answer any questions as needed.

    • A Check-Out Form will be completed for each piece of equipment, recording its condition, serial numbers, and accessories.

  2. Daily Equipment Check-In and Check-Out

    • During production, the Equipment Manager will oversee daily check-ins and check-outs to ensure equipment is accounted for, in working condition, and safely stored when not in use.

    • Any issues or damages identified during daily checks will be reported immediately, and the Equipment Manager will document repairs or replacements needed.

  3. Post-Production Equipment Check-In

    • At the end of the production, all equipment will be returned to the Equipment Manager for final check-in and inspection.

    • The Equipment Manager will compare the equipment’s condition to the initial check-out form and document any damages, missing parts, or maintenance needs.

    • A Final Equipment Report will be generated and submitted to the Producer, including any equipment loss or repair costs.

 

4. Equipment Maintenance and Repairs

​

  1. Routine Maintenance Schedule

    • The Equipment Manager will maintain a Routine Maintenance Schedule for all in-house equipment, ensuring it is regularly inspected, cleaned, and serviced.

    • Maintenance checks will be scheduled based on usage, manufacturer guidelines, and F7 Studios’ standards, ensuring equipment longevity and reliability.

  2. Reporting Damages and Repair Protocols

    • If any equipment is damaged during production, the crew member responsible must report it immediately to the Equipment Manager.

    • The Equipment Manager will assess the damage, document the incident, and coordinate repairs with authorized service providers or, if necessary, recommend equipment replacement.

    • Costs associated with repairs or replacements will be reported to the Financial Analyst and logged in the EMS.

  3. Quality Control and Post-Repair Testing

    • After repairs, all equipment will undergo testing to confirm it is fully operational and meets quality standards.

    • Any equipment that fails to meet quality standards will be either re-serviced or decommissioned if it cannot be reliably used for future projects.

 

5. Resource Allocation Tracking and Reporting

​

  1. Daily Usage Logs

    • The Equipment Manager will maintain Daily Usage Logs in the EMS, tracking the use of each piece of equipment by department and production day.

    • Logs will include details such as equipment status, assigned users, and any maintenance performed, helping track wear and usage patterns.

  2. Weekly Resource Allocation Report

    • The Producer will review weekly resource allocation reports to monitor equipment utilization, assess budget adherence, and identify any resource inefficiencies.

    • These reports will be shared with the CFO for budget tracking and submitted to the Director to keep them informed of equipment availability and issues.

  3. End-of-Project Resource Report

    • Upon project completion, the Equipment Manager will prepare a Final Resource Report, summarizing equipment usage, total rental costs, maintenance expenses, and any resource allocation challenges encountered.

    • This report will be reviewed by the CFO and used for budgeting and planning in future projects.

 

6. Safety and Security Protocols

​

  1. On-Set Equipment Safety

    • The Equipment Manager will brief crew members on equipment safety protocols, covering proper handling, storage, and emergency procedures for equipment-related hazards.

    • All crew members must follow safety protocols, including securing equipment during use and safely storing items when not in operation.

  2. Security of High-Value Equipment

    • High-value equipment (e.g., cameras, lighting kits) will be stored in secure, designated areas on set and monitored by designated crew members.

    • When equipment is not in use or the set is vacant, high-value items must be stored in locked cases or secure storage areas to prevent theft or damage.

  3. Insurance Coverage

    • The Insurance Coordinator will confirm that all in-house and rented equipment is covered under F7 Studios’ insurance policies.

    • Certificates of insurance will be provided to vendors and documented for high-value items, ensuring coverage in case of damage, loss, or theft.

 

7. Continuous Improvement and Equipment Evaluation

​

  1. Post-Project Evaluation

    • After each project, the Producer and Equipment Manager will review equipment utilization, maintenance needs, and any equipment issues encountered.

    • This evaluation will be used to identify equipment that may need replacement, assess the adequacy of current inventory, and improve future resource planning.

  2. Equipment and Resource Needs Assessment

    • The Equipment Manager and CFO will conduct an annual assessment of F7 Studios’ equipment and resource needs, considering new technology, wear and tear, and any production trends that may require updates to inventory.

    • Recommendations for new purchases or decommissioning of outdated equipment will be presented to the CEO for approval.

  3. SOP Review and Update

    • The Equipment and Resource Allocation SOP will be reviewed annually by the Producer, Equipment Manager, and CFO to incorporate feedback, best practices, and updates to ensure continuous improvement.

bottom of page